How much a data infrastructure costs in 2026
A realistic breakdown of building and running a data infrastructure: people, cloud, licences and maintenance. And how to make it a predictable cost.
Read articleA practical guide to calculating the return on your data projects: formula, hidden costs, tangible and intangible benefits and real examples for leadership.

Investing in data is easy to justify on paper and hard to measure on the P&L. Without a clear return calculation, data projects compete at a disadvantage against more tangible investments. This guide gives you a simple formula and a framework to defend — or challenge — any data initiative.
Return is expressed as ROI = (net benefit ÷ total cost) × 100. Net benefit is value generated minus cost; total cost is everything you invested. The difficulty is not the formula but estimating both sides well.
Time is the most underestimated cost. A project that takes nine months to bear fruit costs nine months of decisions made without data.
A project costing €40,000/year that eliminates 1,200 hours of manual reporting (≈ €36,000), fixes a recurring billing error (≈ €20,000) and enables a pricing decision worth €60,000 in margin: net benefit = €116,000 − €40,000 = €76,000. ROI = (76,000 ÷ 40,000) × 100 = 190%.
Paying for real consumption instead of fixed servers reduces the denominator: you do not invest in idle capacity. If the provider also optimises each process to consume less, cost falls without losing results, and ROI rises.
The best data project is the one that turns investment into decisions fastest.
Data ROI is (net benefit ÷ total cost) × 100, but the art is estimating both sides — including the easily forgotten cost of time and the benefits beyond direct savings. Consumption pricing plus optimisation improves the ratio by cutting idle capacity. Well-scoped projects often exceed 100% in the first year.
Tie each decision to a concrete business metric (margin, churn, turnover) and estimate the impact of improving it, even conservatively. A prudent, documented estimate beats ignoring the benefit.
With a managed approach and a scoped first use case, payback usually starts within weeks or a few months, because time to result is short.
It depends, but well-scoped reporting, pricing or efficiency projects often exceed 100% in the first year once all benefits are counted.
Every month a solution is not live is a month of decisions made without data — an opportunity cost rarely on the budget but very real.
It cuts the cost denominator by removing idle capacity, and with optimisation each process consumes less for the same result.
Counting only direct savings and ignoring better decisions, risk reduction and new opportunities — plus forgetting the cost of time.
Tell us what you want to achieve. Data Layer connects, processes and delivers the result up and running, with no infrastructure for you to manage.